A free service by Scientific Network Management s-n-m.eu ↗
Funding Radar

Platforms and end-products

eu EDF-EDIP-P-2027-LS-IRA-PE · European Defence Fund (EDF)

Statusopen
Opens17 Jun 2026
Deadline16 Feb 2027 — 156 days
ActionEDF Lump Sum Grants
Official pagehttps://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunit…
Fetched2026-09-13 04:00:37+00:00

You are reading one call. 1,385 are open right now.

A search matches words. It cannot know what your institution works on. Give the name and every open call is ranked against it — this one included.

Free · no account · nothing stored that identifies you

Scope

Expected Impact: Projects are expected to deliver results aligned with the expected results set out in this call topic and to evidence their contribution through dedicated KPIs defined in the proposal. Expected results include: • tangible capacity increases in EU-based production enabling the ramp-up of the targeted platforms or end-products, with demonstrated contribution to competitiveness ; • improved resilience & geographical distribution of supply and industrial capability, reducing single points of failure across forging/machining, key sub-systems, composites and assembly/integration; • strengthened availability and security of supply of the targeted platforms or end-products with identified risks and exposure to the risk of materialisation of conventional military threats; • and measurable lead-time reductions , establishment or availability of reserved capacity where applicable, and workforce traine d to operate and sustain the reinforced production lines (including, where relevant, MaaS and dual-use conversion pathways). Proposals shall define, baseline and track KPIs such as added throughput (e.g., units/month of platforms/end-products or critical sub-systems; tonnes/month or batches for forging/machining/composites where relevant), time-to-rate, lead-time reduction, yield/quality improvements, qualified output delivered, reserved capacity parameters, numbers of staff trained, and indicators evidencing risk mitigation (e.g., supply-chain robustness, integration maturity, maintainability readiness and obsolescence management outcomes). Where implemented, the physical and cyber protection WP is expected to deliver measurable improvements in site and production security, evidenced through threat assessment protected sites to support the security measures and KPIs (e.g., coverage of protected areas/assets, detection/alert performance, response readiness, critical vulnerabilities mitigated). Those KPIs shall be linked to the project’s overall risk register and show how risk exposure is reduced and how production continuity is improved, thereby limiting the likelihood and/or impact of incidents that could delay production ramp-up or affect output and delivery reliability (including, where relevant, the availability of reserved capacity and the achievement of workforce-related milestones) Objective: This topic aims to strengthen the competitiveness, responsiveness and ability of the EDTIB to reinforce EU industrial production capacity for key platforms and end-products, across land, air, naval and underwater domains: • artillery systems; • armoured ve…

Found one worth pursuing?

Finding the call is the easy half. Scientific Network Management is the grant-writing practice behind this radar — 13 years of writing and managing EU-funded research projects, including two EuropeAid technical assistance contracts building biotechnology centres in Türkiye as Team Leader.

Proposal writingHorizon Europe, EU4Health, EuropeAid. Concept to submission, or a review of a draft you already have.
Consortium buildingFinding and approaching the partners a call requires, and holding the consortium together through drafting.
Project managementRunning the project after the award — reporting, deliverables, coordination, audits.

Talk to us What SNM does No obligation, and nothing here is conditional on using us — the radar stays free and complete either way.